Mission Critical
SwitchNAP 8

The Switch brand of data centers are unique in that they have created and patented their own design. SwitchNAP facilities provide a sustainable collection of services including co-location, connectivity, cloud, campus, and community.

On Phase 2 of the SwitchNAP 8 project, MMC Contractors provided the installation of mechanical systems for the data center and supporting power spine, including:

• painted ductwork;

• hydronic and refrigeration piping;

• energy recovery ventilators; and

• exhaust fans.

All ductwork was pre-fabricated and painted with an auto-finish before installation to ensure the highest quality.


Additional Project Information:

Square Feet: 58,000
Project Location: Las Vegas, Nevada
General Contractor: Martin-Harris Construction
Field Office: Las Vegas